Banner
company's product
Coal-to-electricity buffering and heat storage tank pump integrated equipment
Coal-to-electricity buffering and heat storage tank pump integrated equipment The newly integrated buffered regenerative pump integrated equipment for the northern coal-to-electric heating system integrates the three components of the thermal storage buffer tank, circulating water pump and thermostatic valve in the heating system, and adopts patented integrated design to facilitate transportation and Installation, one-stop solution to installation site location, time-consuming power consumption, land occupation, waterway antifreeze, rapid constant temperature heating, pump noise and other issues!...

The newly integrated buffered regenerative pump integrated equipment for the northern coal-to-electric heating system integrates the three components of the thermal storage buffer tank, circulating water pump and thermostatic valve in the heating system, and adopts patented integrated design to facilitate transportation and Installation, one-stop solution to installation site location, time-consuming power consumption, land occupation, waterway antifreeze, rapid constant temperature heating, pump noise and other issues!


Buffer regenerator pump integrated equipment factory integrated design, accessories using famous brand products, stable quality and security, customers only need to be equipped with wires and single-size water pipes and fittings, procurement and storage management costs reduced by about 80%.


On-site installation only needs to connect insulated pipes and wires, no need to connect complicated components such as water pump and water tank. The installation personnel have low technical requirements, and the general plumber can complete it, and the construction work volume is reduced by about 80%. Moreover, it avoids the problems of safe use of electricity caused by improper installation, unsightly piping, short life of the pump due to improper installation, and water leakage.


Box pump integrated equipment structure

Coal-to-electricity buffering and heat storage tank pump integrated equipment


The integrated closed design and small footprint make the pump water tank clean and tidy; and adopt multiple noise reduction and noise reduction measures, the pump running noise is reduced by about 5dB (A).


Solve the problem of antifreeze in waterway and save nearly 1000 yuan to add antifreeze cost. The heat storage buffer tank adopts special structure design, and sufficient buffer space is reserved at the top of the water tank. When the machine is stopped (whether it is normal shutdown or abnormal failure, power failure), the water stored in the heat pump main unit will automatically return to the water tank, thus completely solving the power failure. When the host device freezes. Eliminate the hassle and expense of adding antifreeze.


The heat storage and constant temperature double-effect design, the heat supply guarantee is greatly improved than the general system, and the frequency conversion heating effect is achieved, and the energy saving is increased by about 50%. The design is preferentially for indoor heating and heating. When the indoor temperature reaches the rear thermostatic valve, the hot water in the hot water storage tank is heated, so that the water temperature rises rapidly, and the heat pump stops after reaching the set temperature. When the indoor temperature is lower than the set value, the water pump starts to send the high-temperature water in the water tank to the indoor heat-dissipating end for heating. When the indoor temperature reaches the set temperature quickly, the host reheats the water in the hot water storage tank. Under the premise of ensuring the indoor temperature, the heat pump can prolong the interval between start and stop, avoid excessive power consumption caused by the frequent start of the heat pump motor, and quickly maintain the indoor heating supply.


Buffer regenerator pump integrated equipment product parameters: